2-6
S
UPER
S
ERVER 8016B-TLF User's Manual
Figure 2-3. Installing the Server into a Rack
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack unit. The next
step is to install the server into the rack. Do this by lining up the rear of the chassis
rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping
the pressure even on both sides (you may have to depress the locking tabs when
inserting). See Figure 2-3.
When the server has been pushed completely into the rack, you should hear the
locking tabs "click". Finish by inserting and tightening the thumbscrews that hold
the front of the server to the rack.
Summary of Contents for SUPERSERVER 8016B-TLF
Page 1: ...SUPER SUPERSERVER 8016B TLF USER S MANUAL Revision 1 0...
Page 5: ...v Preface Notes...
Page 14: ...1 6 SUPERSERVER 8016B TLF User s Manual...
Page 22: ...2 8 SUPERSERVER 8016B TLF User s Manual Figure 2 4 Accessing the Inside of the System...
Page 24: ...2 10 SUPERSERVER 8016B TLF User s Manual Notes...
Page 28: ...3 4 SUPERSERVER 8016B TLF User s Manual Notes...
Page 60: ...5 28 SUPERSERVER 8016B TLF User s Manual Notes...
Page 104: ...A 2 SUPERSERVER 8016B TLF User s Manual Notes...