Chapter 2: Server Installation
2-9
2. CD-ROM and floppy disk drives:
A slim CD-ROM and a floppy drive should be preinstalled in your server.
Refer to Chapter 6 if you need to reinstall a CD-ROM and/or floppy disk
drive to the system.
3. Check the SCSI disk drives:
Depending upon your system's configuration, your system may have one
or more drives already installed. If you need to install SCSI drives, please
refer to Chapter 6.
4. Check the airflow:
Airflow is provided by two heavy duty 10-cm blower fans. The system
component layout was carefully designed to direct sufficient cooling air-
flow to the components that generate the most heat. Note that all power
and data cables have been routed in such a way that they do not block
the airflow generated by the fans.
5. Supplying power to the system:
The last thing you must do is to provide input power to the system. Plug
the power cord from the power supply unit into a high-quality power
strip that offers protection from electrical noise and power surges. It is
recommended that you use an uninterruptible power supply (UPS).
Summary of Contents for SUPERSERVER 6022P-8R
Page 1: ...SUPERSERVER 6022P 8R SUPERSERVER 6022P 8 USER SMANUAL 1 0a SUPER...
Page 5: ...v Preface Notes...
Page 10: ...SUPERSERVER 6022P 8R 6022P 8 User s Manual x Notes...
Page 26: ...2 10 SUPERSERVER 6022P 8R 6022P 8 Manual Notes...
Page 30: ...SUPERSERVER 6022P 8R 6022P 8 User s Manual 3 4 Notes...
Page 38: ...5 4 SUPERSERVER 6022P 8R 6022P 8 User s Manual Figure 5 2 Heatsink Installation...
Page 92: ...7 24 SUPERSERVER 6022P 8R 6022P 8 Manual Notes...
Page 98: ...A 6 SUPERSERVER 6022P 8R 6022P 8 Manual Notes...
Page 104: ...B 6 SUPERSERVER 6022P 8R 6022P 8R Manual Notes...