Chapter 2: Server Installation
2-5
Installing the Chassis Rails:
Position the fixed chassis rail sections you just removed along the side of
the 6013L-8 making sure the screw holes line up. Note that these two rails
are left/right specific. Screw the rail securely to the side of the chassis
(see Figure 2-2). Repeat this procedure for the other rail on the other side
of the chassis. You will also need to attach the rail brackets when installng
into a telco rack.
Locking Tabs:
As you have seen, both chassis rails have a locking tab,
which serves two functions. The first is to lock the server into place when
installed and pushed fully into the rack, which is its normal position. Sec-
ondly, these tabs also lock the server in place when fully extended from the
rack. This prevents the server from coming completely out of the rack
when you pull it out for servicing.
Figure 2-2. Installing Chassis Rails
Installing the Rack Rails:
Determine where you want to place the SuperServer 6013L-8 in the rack.
(See Rack and Server Precautions in Section 2-3.) Position the fixed rack
rail/sliding rail guide assemblies at the desired location in the rack, keeping
the sliding rail guide facing the inside of the rack. Screw the assembly
securely to the rack using the brackets provided. Attach the other assem-
Summary of Contents for SUPERSERVER 6013L-8
Page 1: ...SUPERSERVER 6013L 8 USER SMANUAL 1 0a SUPER...
Page 5: ...v Preface Notes...
Page 10: ...Notes SUPERSERVER 6013L 8 User s Manual x...
Page 38: ...5 4 SUPERSERVER 6013L 8 User s Manual Figure 5 2 Heatsink Installation...
Page 69: ...Chapter 6 Advanced Chassis Setup 6 9 Figure 6 5 Removing Replacing the Power Supply...
Page 70: ...6 10 SUPERSERVER 6013L 8 Manual Notes...
Page 96: ...7 26 SUPERSERVER 6013L 8 Manual Notes...
Page 98: ...A 2 SUPERSERVER 6013L 8 User s Manual Notes...