2-6
S
UPER
S
ERVER 5016i-URF User's Manual
Figure 2-3. Installing the Server into a Rack
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack unit. The next
step is to install the server into the rack. Do this by lining up the rear of the chassis
rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping
the pressure even on both sides (you may have to depress the locking tabs when
inserting). See Figure 2-3.
When the server has been pushed completely into the rack, you should hear the
locking tabs "click".
Stability hazard. The rack stabilizing mechanism must be in place, or the
rack must be bolted to the fl oor before you slide the unit out for servicing.
Failure to stabilize the rack can cause the rack to tip over.
Summary of Contents for SUPERSERVER 5016i-URF
Page 1: ...SUPERSERVER 5016i URF SUPER USER S MANUAL 1 0a...
Page 5: ...v Preface Notes...
Page 48: ...4 20 SUPERSERVER 5016i URF User s Manual Notes...
Page 86: ...6 10 SUPERSERVER 5016i URF User s Manual Figure 6 6 Removing Replacing the Power Supply...
Page 110: ...7 24 SUPERSERVER 5016i URF User s Manual Notes...
Page 112: ...A 2 SUPERSERVER 5016i URF User s Manual Notes...