2-2
S
UPER
S
ERVER 5016i-URF User's Manual
Choosing a Setup Location
•
Leave enough clearance in front of the rack to enable you to open the front door
completely (~25 inches) and approximately 30 inches of clearance in the back
of the rack to allow for suffi cient airfl ow and ease in servicing.This product is for
installation only in a Restricted Access Location (dedicated equipment rooms,
service closets and the like).
•
This product is not suitable for use with visual display work place devices
acccording to §2 of the the German Ordinance for Work with Visual Display
Units.
2-4 Warnings and Precautions
Rack Precautions
•
Ensure that the leveling jacks on the bottom of the rack are fully extended to
the fl oor with the full weight of the rack resting on them.
•
In single rack installation, stabilizers should be attached to the rack. In multiple
rack installations, the racks should be coupled together.
•
Always make sure the rack is stable before extending a component from the
rack.
•
You should extend only one component at a time - extending two or more si-
multaneously may cause the rack to become unstable.
Server Precautions
•
Review the electrical and general safety precautions in Chapter 4.
•
Determine the placement of each component in the rack
before
you install the
rails.
•
Install the heaviest server components on the bottom of the rack fi rst, and then
work up.
•
Use a regulating uninterruptible power supply (UPS) to protect the server from
power surges, voltage spikes and to keep your system operating in case of a
power failure.
Summary of Contents for SUPERSERVER 5016i-URF
Page 1: ...SUPERSERVER 5016i URF SUPER USER S MANUAL 1 0a...
Page 5: ...v Preface Notes...
Page 48: ...4 20 SUPERSERVER 5016i URF User s Manual Notes...
Page 86: ...6 10 SUPERSERVER 5016i URF User s Manual Figure 6 6 Removing Replacing the Power Supply...
Page 110: ...7 24 SUPERSERVER 5016i URF User s Manual Notes...
Page 112: ...A 2 SUPERSERVER 5016i URF User s Manual Notes...