WIT Company – поставка серверов, СХД,
сетевого оборудования, лицензионного ПО
Chapter 2: Server Installation
2-9
2-8
SUPERSERVER 1028R-TDW USER'S MANUAL
Figure 2-4. Installing the Outer Rails to the Rack
SCALE 0.380
1
2
1
3
1
3
Figure 2-5. Installing the Server into a Rack
Installing the Chassis into a Rack (Figure 2-5)
1.
Confirm that chassis includes the inner rails and rail extensions . Also, confirm
that the outer rails are installed on the rack.
2. Line chassis rails with the front of the rack rails.
3. Slide the chassis rails into the rack rails, keeping the pressure even on both
sides (you may have to depress the locking tabs when inserting). When the
server has been pushed completely into the rack, you should hear the locking
tabs "click".
4. (Optional) Insert and tightening the thumbscrews that hold the front of the
server to the rack.
Note:
The figure above is for illustrative purposes only. Always install servers to
the bottom of the rack first.
Note:
The figure above is for illustrative purposes only. Always install servers to
the bottom of the rack first.
Summary of Contents for SUPERSERVER 1028R-TDW
Page 1: ...WIT RU WIT Company SUPERSERVER 1028R TDW USER S MANUAL 1 0a...
Page 9: ...WIT RU WIT Company 1 6 SUPERSERVER 1028R TDW User s Manual Notes...
Page 15: ...WIT RU WIT Company 2 10 SUPERSERVER 1028R TDW USER S MANUAL Notes...
Page 19: ...WIT RU WIT Company 3 6 SUPERSERVER 1028R TDW USER S MANUAL Notes...
Page 30: ...WIT RU WIT Company 4 20 SUPERSERVER 1028R TDW User s Manual Notes...
Page 73: ...WIT RU WIT Company A 2 SUPERSERVER 1028R TDW User s Manual Notes...