5-2
S
UPER
S
ERVER 1025W-U/1025W-UR User's Manual
IMPORTANT!
Always connect the power cord last and remove it fi rst before add-
ing, removing or changing any hardware components. Make sure that you install
the processor into the CPU socket
before
you install the heatsink and fan. The
X7DWU can support either one or two Xeon processors. If installing one processor
only, install it into CPU socket #1.
Notes:
1. Intel's boxed Xeon CPU package contains a CPU fan and heatsink assembly. If
you buy a CPU separately, make sure that you use only Intel-certifi ed multi-direc-
tional heatsinks and fans.
2. When purchasing a Xeon CPU or when receiving a serverboard with a CPU
pre-installed, make sure that the CPU plastic cap is in place and none of the CPU
pins are bent; otherwise, contact the retailer immediately.
!
5-2 Processor and Heatsink Installation
When handling the processor, avoid placing direct pressure on the label
area of the fan. Also, do not place the serverboard on a conductive
surface, which can damage the BIOS battery and prevent the system
from booting up.
Installing the Processor
A black PnP cap is attached to
1.
the load plate to protect the CPU
socket. Press the load lever down
and away from the retention clasp
to release the load plate from its
locked position.
Gently lift the load lever to open
2.
the load plate.
Load lever
PnP cap
Load plate released
Summary of Contents for SUPERSERVER 1025W-U
Page 1: ...SUPERSERVER 1025W U SUPERSERVER 1025W UR SUPER USER S MANUAL 1 0a...
Page 5: ...v Preface Notes...
Page 14: ...SUPERSERVER 1025W U 1025W UR Manual 1 6 Notes...
Page 21: ...Chapter 2 Server Installation 2 7 Figure 2 4 Installing the Outer Rails to the Rack 2 3 3...
Page 26: ...2 12 SUPERSERVER 1025W U 1025W UR Manual Notes...
Page 70: ...6 10 SUPERSERVER 1025W U 1025W UR Manual Notes...
Page 102: ...A 6 SUPERSERVER 1025W U 1025W UR User s Manual Notes...
Page 108: ...B 6 SUPERSERVER 1025W U 1025W UR User s Manual Notes...
Page 112: ...C 4 SUPERSERVER 1025W U 1025W UR User s Manual Notes...