Chapter 2: Server Installation
2-9
2-6 Preparing to Power On
Next, you should check to make sure the peripheral drives and the SATA drives
and SATA backplane have been properly installed and all connections have been
made.
Checking the SATA drives
The SATA disk drives are accessable from the front of the server and can be
installed and removed from the front of the chassis without removing the top
chassis cover.
Depending upon your system's confi guration, your system may have one or
more drives already installed. If you need to install SATA drives, please refer
to Chapter 6.
Checking the Airfl ow
Airfl ow is provided by six sets of 4-cm PWM fans (each set of fans consists
of two fans that are mounted back to back) and an air shroud. The system
component layout was carefully designed to direct suffi cient cooling airfl ow to
the components that generate the most heat.
Note that all power and data cables have been routed in such a way that they
do not block the airfl ow generated by the fans.
Providing Power
Plug the power cords from the power supplies unit into a high-quality power
strip that offers protection from electrical noise and power surges.
It is recommended that you use an uninterruptible power supply (UPS).
Finally, depress the power on button on the front of the chassis.
1.
2.
1.
2.
1.
2.
3.
Summary of Contents for SUPERSERVER 1025TC-10G
Page 1: ...SUPER SUPERSERVER 1025TC T SUPERSERVER 1025TC 10G USER S MANUAL Revision 1 0...
Page 5: ...v Preface Notes...
Page 16: ...1 8 SUPERSERVER 1025TC T 1025TC 10G User s Manual Notes...
Page 30: ...3 4 SUPERSERVER 1025TC T 1025TC 10G User s Manual Notes...
Page 94: ...A 6 SUPERSERVER 1025TC T 1025TC 10G User s Manual Notes...
Page 100: ...B 6 SUPERSERVER 1025TC T 1025TC 10G User s Manual Notes...
Page 104: ...C 4 SUPERSERVER 1025TC T 1025TC 10G User s Manual Notes...