Sunways STH-10K-HT User Manual Download Page 7

12

13

     

Mode 5

In the purely off-grid mode, power 
from PV will supply the back-up 
loads first and then charge the 
battery if there’re surplus.

     

Mode 3

In this working mode, the inverter 
will use the power from PV or 
grid (Set in the App) to charge the 
battery until it is fully charged, 
and as long as the grid is there, 
the battery won’t discharge.
When the grid is cut off, power 
from PV and battery will supply to 
the loads connected in the back-
up side (UPS).

When the power from PV isn’t 
enough, the battery will discharge 
to supply back-up loads together 
with PV.

     

Mode 4

In this working mode, you can set 
charge/discharge power and time 
in the App, inverter will use the 
power from PV or grid(whether 
to  use  can  be  set  in  the  App) 
to  charge  the  battery  in  the 
predetermined period.

Inverter will use power from PV 
and battery to supply loads in the 
predetermined period and the 
insufficient part will be supplied 
by the grid.

No Grid

No Grid

×

3.1.6 Off-grid Output Ability (UPS Ability)
Sunways STH hybrid inverter supports max 2times off-grid instantaneous overload of rated 
output power, and each phase support 1.25times continuous overload of rated output power 
but only one of them can reach 1.25times output power at the same time.
3.1.7 Storage conditions
1) Inverter must be stored in its original packaging.
2) The storage temperature should be in the range of -30 ° C and + 60 ° C, and the relative 
humidity stored is less than 90%.
3) If a batch of inverters needs to be stored, the height of each pile should be no more 
than 6 levels.

PV

PV

PV

PV

PV

Inverter

Inverter

Inverter

Inverter

Inverter

Load

Load

Load

Load

Load

Grid

Grid

Grid

Battery

Battery

Battery

Battery

Battery

Summary of Contents for STH-10K-HT

Page 1: ...1 Three phase High voltage Hybrid Inverter STH 4K 5K 6K 8K 10K 12KTL HT User Manual Ningbo Sunways Technologies Co Ltd...

Page 2: ...e 16 3 4 Packing List 17 4 Product Installation 18 4 1 Selection of Installation Location 18 4 2 Mounting the Inverter 19 4 3 Electrical Connection 21 4 4 Communication Connection 34 4 5 Monitoring De...

Page 3: ...n and maintenance 2 1 6 To use this grid connected inverter for power generation needs the permission of the local power supply authority 2 1 7 During the operation of the inverter the surface tempera...

Page 4: ...e symbols displayed on the hybrid inverter nameplate and packing box 2 4 1 Symbols on the Hybrid Inverter Description Symbol Grid status indicator 2 4 2 Symbol on the Inverter nameplate The inverter c...

Page 5: ...d below STH 4KTL HT STH 5KTL HT STH 6KTL HT STH 8KTL HT STH 10KTL HT STH 12KTL HT 3 1 3 Applicable grid type The applicable grid types of the Sunways STH 4 12kW series are TN S TN C TN C S and TT When...

Page 6: ...in in if the battery is not enough Mode 2 In this working mode set the Pmax from grid in the App can realize the Peak Load Shifting When the loads consumption less than the Pmax loads are supplied by...

Page 7: ...ge the battery in the predetermined period Inverter will use power from PV and battery to supply loads in the predetermined period and the insufficient part will be supplied by the grid No Grid No Gri...

Page 8: ...ure 3 4 410mm 175mm Name Plate Logo Display 550mm 410mm Figure 3 5 Bottom view Figure 3 6 Inverter back view 3 2 3 Inverter bottom view as shown in Figure 3 5 3 2 4 Inverter back view as shown in Figu...

Page 9: ...the display Red An alarm or fault is detected view the fault info on the display 5 Display On Display the inverter operation information Off Display off to save power press the button to wake up the d...

Page 10: ...ectly to strong sunlight to prevent the power derating due to excessive temperature 4 The inverter should be installed in a place with shelter to prevent direct exposure to sunlight and rain 5 Install...

Page 11: ...ning 4 3 Electrical Connection Danger hint A high voltage in the conductive part of the inverter may cause an electric shock When performing any installation on the inverter make sure that the AC and...

Page 12: ...2 L1 CT C CT B CT A PV Strings Battery To Battery To Sunways Meter Power Meter Sunways Meter AC Breacker AC Breacker AC Breacker AC Breacker AC Breacker 1 phase Loads 3 phase Loads Loads FN Set Run Ac...

Page 13: ...stem all inverters PE wire need to be connected to the same grounding copper bar to ensure equipotential bonding 4 3 2 External ground connection Ground terminal connection steps 1 The external ground...

Page 14: ...o the corresponding positive and negative connectors pull back the cable to ensure that the terminal is tightly attached in the connector 6 Use an open end wrench to screw the nut to the end to ensure...

Page 15: ...ered when making AC output connection 1 An independent AC breaker is required in both inverter on grid and back up output side and any loads cannot be connected with inverter directly 2 Before making...

Page 16: ...ence as shown in Figure 4 23 Strip Length 8mm 40 60mm Wire Diameter 12 18mm Cables Screw cap The insulator AC sheet cover BACK UP ON GRID Single hole seal ring Figure 4 25 Figure 4 26 Figure 4 24 3 Pu...

Page 17: ...S1 10 L3 S2 12 L Power supplied from 220V grid 13 N RS485 RS485 Communicate with inverter CT installation direction and phase sequence should strictly follow the instruction in the user manual otherw...

Page 18: ...on bus interface EMS EMS power dispatching interface RLYOUT Dry contact output a group of normally open contact passive dry contact PARCAN EMS RLYOUT 4 4 2 Communication between inverter and meter The...

Page 19: ...ake sure the battery you selected is in the battery approval list of Sunways otherwise the system may not work properly Please contact your installer or Sunways service team for confirmation if you re...

Page 20: ...the installation represents that the assembly is in place 5 Start and Stop 5 1 Start Inverter When starting the inverter follow these steps 1 Turn the DC switch in the inverter bottom to the ON positi...

Page 21: ...te and Local before starting the auto test Remote is set as 1 by default which only can be modified to 0 by sending an external command and Local is set as 0 by default which can be modified to 1 thro...

Page 22: ...e installer or manufacture SPI Fault 1 Restart the inverter 2 Seek for help from the installer or manufacture E2 Fault 1 Restart the inverter 2 Seek for help from the installer or manufacture GFCI Dev...

Page 23: ...5 Voltage Harmonic Distortion 3 LinearLoad Model STH 4KTL HT STH 5KTL HT STH 6KTL HT STH 8KTL HT STH 10KTL HT STH 12KTL HT Efficiency Max Efficiency 98 1 98 1 98 1 98 2 98 2 98 2 European Efficiency 9...

Page 24: ...V1 01 EN Address No 1 Second Road Green Industrial Zone Chongshou Town Cixi City ZheJiang Province PEOPLE S REPUBLIC OF CHINA Website www sunways tech com Service Mail service sunways tech com Hotline...

Reviews: