2.2 Statement

Ningbo Sunways technologies Co., Ltd. has the right not to undertake quality assurance in any 
of the following circumstances:
2.2.1 Damages caused by irregular transportation.
2.2.2 Damages caused by incorrect storage, installation or use.
2.2.3 Damages caused by installation and use of equipment by non-professionals or untrained 
personnel.
2.2.4 Damages caused by failure to comply with the instructions and safety warnings in the 
products and documents.
2.2.5 Damages caused by running in an environment that doesn't meet the requirements 
which stated in the documents.
2.2.6 Damages caused by operation beyond the parameters specified in applicable technical 
specifications.
2.2.7 Damages caused by unauthorized disassembly, alteration of products or modification of 
software codes.
2.2.8 Damages caused by abnormal natural environment (force majeure, such as lightning, 
earthquake, fire, storm, etc.).
2.2.9 Any damages caused by the installation or operation conditions beyond the stipulated 
national standard corresponding to the country where the inverter installed.
2.2.10 Products beyond the warranty period.

2.3 Important Safety Matters

The following symbols may appear in this manual, which represent the following meanings:

2.4 Symbols Explanation

This chapter mainly elaborates the symbols displayed on the hybrid inverter, nameplate and 
packing box.
2.4.1 Symbols on the Hybrid Inverter

Description

Symbol

Grid status indicator.

2.4.2 Symbol on the Inverter nameplate

The inverter cannot be disposed of with household waste.

Description

Symbol

Please read the instructions carefully before installation.

Do not touch any internal parts of the inverter until 5 min after 

being disconnected from the mains and PV input.

CE mark, the inverter complies with the requirements of the 

applicable CE guidelines.

Danger. Risk of electric shock!

TUV certification.

Danger

Warning

Caution

Used to warn of urgent dangerous situations, if not avoided, it 

could result in death or serious personal injury.

Description

Symbol

Used to warn of potentially dangerous situations, if not avoided, it 

may result in death or serious personal injury.

Used to warn of potentially dangerous situations, if not avoided, it 

may result in moderate or minor personal injury.

Attention

Used to transmit the safety warning information about equipment 

or environment, if not avoided, it may cause equipment damage, 

data  loss,  equipment  performance  degradation  or  other 

unpredictable results. "Attention" does not involve personal 

injury.

Note

Used to highlight important information, best practices and 

tips, etc. it's not warning, doesn't involve personal injury and 

equipment damage information.

Power indicator.

Grounding symbol, the inverter casing needs to be properly 

grounded.

Battery level indicator.

Inverter status indicator.

Summary of Contents for STH-10K-HT

Page 1: ...1 Three phase High voltage Hybrid Inverter STH 4K 5K 6K 8K 10K 12KTL HT User Manual Ningbo Sunways Technologies Co Ltd...

Page 2: ...e 16 3 4 Packing List 17 4 Product Installation 18 4 1 Selection of Installation Location 18 4 2 Mounting the Inverter 19 4 3 Electrical Connection 21 4 4 Communication Connection 34 4 5 Monitoring De...

Page 3: ...n and maintenance 2 1 6 To use this grid connected inverter for power generation needs the permission of the local power supply authority 2 1 7 During the operation of the inverter the surface tempera...

Page 4: ...e symbols displayed on the hybrid inverter nameplate and packing box 2 4 1 Symbols on the Hybrid Inverter Description Symbol Grid status indicator 2 4 2 Symbol on the Inverter nameplate The inverter c...

Page 5: ...d below STH 4KTL HT STH 5KTL HT STH 6KTL HT STH 8KTL HT STH 10KTL HT STH 12KTL HT 3 1 3 Applicable grid type The applicable grid types of the Sunways STH 4 12kW series are TN S TN C TN C S and TT When...

Page 6: ...in in if the battery is not enough Mode 2 In this working mode set the Pmax from grid in the App can realize the Peak Load Shifting When the loads consumption less than the Pmax loads are supplied by...

Page 7: ...ge the battery in the predetermined period Inverter will use power from PV and battery to supply loads in the predetermined period and the insufficient part will be supplied by the grid No Grid No Gri...

Page 8: ...ure 3 4 410mm 175mm Name Plate Logo Display 550mm 410mm Figure 3 5 Bottom view Figure 3 6 Inverter back view 3 2 3 Inverter bottom view as shown in Figure 3 5 3 2 4 Inverter back view as shown in Figu...

Page 9: ...the display Red An alarm or fault is detected view the fault info on the display 5 Display On Display the inverter operation information Off Display off to save power press the button to wake up the d...

Page 10: ...ectly to strong sunlight to prevent the power derating due to excessive temperature 4 The inverter should be installed in a place with shelter to prevent direct exposure to sunlight and rain 5 Install...

Page 11: ...ning 4 3 Electrical Connection Danger hint A high voltage in the conductive part of the inverter may cause an electric shock When performing any installation on the inverter make sure that the AC and...

Page 12: ...2 L1 CT C CT B CT A PV Strings Battery To Battery To Sunways Meter Power Meter Sunways Meter AC Breacker AC Breacker AC Breacker AC Breacker AC Breacker 1 phase Loads 3 phase Loads Loads FN Set Run Ac...

Page 13: ...stem all inverters PE wire need to be connected to the same grounding copper bar to ensure equipotential bonding 4 3 2 External ground connection Ground terminal connection steps 1 The external ground...

Page 14: ...o the corresponding positive and negative connectors pull back the cable to ensure that the terminal is tightly attached in the connector 6 Use an open end wrench to screw the nut to the end to ensure...

Page 15: ...ered when making AC output connection 1 An independent AC breaker is required in both inverter on grid and back up output side and any loads cannot be connected with inverter directly 2 Before making...

Page 16: ...ence as shown in Figure 4 23 Strip Length 8mm 40 60mm Wire Diameter 12 18mm Cables Screw cap The insulator AC sheet cover BACK UP ON GRID Single hole seal ring Figure 4 25 Figure 4 26 Figure 4 24 3 Pu...

Page 17: ...S1 10 L3 S2 12 L Power supplied from 220V grid 13 N RS485 RS485 Communicate with inverter CT installation direction and phase sequence should strictly follow the instruction in the user manual otherw...

Page 18: ...on bus interface EMS EMS power dispatching interface RLYOUT Dry contact output a group of normally open contact passive dry contact PARCAN EMS RLYOUT 4 4 2 Communication between inverter and meter The...

Page 19: ...ake sure the battery you selected is in the battery approval list of Sunways otherwise the system may not work properly Please contact your installer or Sunways service team for confirmation if you re...

Page 20: ...the installation represents that the assembly is in place 5 Start and Stop 5 1 Start Inverter When starting the inverter follow these steps 1 Turn the DC switch in the inverter bottom to the ON positi...

Page 21: ...te and Local before starting the auto test Remote is set as 1 by default which only can be modified to 0 by sending an external command and Local is set as 0 by default which can be modified to 1 thro...

Page 22: ...e installer or manufacture SPI Fault 1 Restart the inverter 2 Seek for help from the installer or manufacture E2 Fault 1 Restart the inverter 2 Seek for help from the installer or manufacture GFCI Dev...

Page 23: ...5 Voltage Harmonic Distortion 3 LinearLoad Model STH 4KTL HT STH 5KTL HT STH 6KTL HT STH 8KTL HT STH 10KTL HT STH 12KTL HT Efficiency Max Efficiency 98 1 98 1 98 1 98 2 98 2 98 2 European Efficiency 9...

Page 24: ...V1 01 EN Address No 1 Second Road Green Industrial Zone Chongshou Town Cixi City ZheJiang Province PEOPLE S REPUBLIC OF CHINA Website www sunways tech com Service Mail service sunways tech com Hotline...

Reviews: