2.1
Safety information
!
100
Electrical safety
Before opening the cabinet, the solar
inverter must be disconnected from the
grid and from the PV generator.
The solar inverter conducts a hazardous
voltage internally and at the connectors of
the PV generator for approx. five minutes
after isolation from the PV generator and
the grid. The energy storage capacitors are
only fully discharged after this period.
After disconnecting the solar inverter from
the grid and PV generator, you must wait
at least five minutes before opening the
solar inverter.
Mechanical safety
During installation, make sure that the
cables or connection lines fitted to the
solar inverter are securely laid and that
suitable mechanical cable supports
(cable ducts etc.) are used.