background image

                                                                      Specification of excellent controller 

                                                                                                               

Page - 19 - 

15.    Model Description 

 

 

16.    Maintenance 

The  following  inspections  and  maintenance  tasks  are  recommended  at 

least two times per year for best controller performance. 

 

Check that the controller is securely mounted in a clean and dry environment. 

 

Check  that  the  air  flow  and  ventilation  around  the  controller  is  not  blocked. 
Clear all dirt or fragments on the heat sink. 

 

Check all the naked wires to make sure insulation is not damaged for serious 
polarization,  frictional  wear,  dryness,  insects  or  rats  etc.  Maintain  or  replace 
the wires if necessary. 

 

Tighten all the terminals. Inspect for loose, broken, or burnt wire connections. 

 

Check and confirm that LCD is consistent with required. Pay attention to any 
troubleshooting or error indication. Take necessary corrective action. 

 

Confirm  that  all  the  system  components  are  ground  connected  tightly  and 
correctly. 

 

Confirm  that  all  the  terminals  have  no  corrosion,  insulation  damaged,  high 
temperature or burnt/discolored sign, tighten terminal screws to the suggested 
torque. 

 

Inspect for dirt, insects and corrosion, and clear up. 

 

Check and confirm that lighting arrester is in  good condition. Replace a new 
one in time to avoid damaging of the controller and even other equipments. 

 

         

Warning 

Risk  of  electric  shock!  Make  sure  all  the  power  is  turned  off  before  above 

operations, and then follow the corresponding inspections and operations. 

 

 

Summary of Contents for SSWC-06-1224-TA

Page 1: ...el No SSWC 06 1224 TA Version 5 0 Thank you very much for selecting our product This manual offers important information and suggestions with respect to installation use and troubleshooting etc Please...

Page 2: ...ller 5 Step 1 Battery Wiring 5 Step 2 Loading Wiring 6 Step 3 Solar Module Wiring 7 Step 4 Wind turbine PMG Wiring 7 Step 5 Switch power wiring 8 Step 6 Accessories Option 8 Step 7 Confirmation for Wi...

Page 3: ...er than controller rating accordingly 2 General Safety Information Please don t use low quality battery to avoid leakage rust or burn Please don t use thin or low quality cable to avoid leakage or fir...

Page 4: ...light sensor voltage timer and so on 5 Protection Functions Solar cells reverse charging solar cells anti reverse connection Battery over charging over discharge battery anti reverse connection Over...

Page 5: ...er the controller Loose power connections and or corroded wires may result in resistive connections that melt wire insulation burn surrounding materials or even cause fire Ensure tight connections and...

Page 6: ...h the drilled holes in step 4 Secure the controller in place using the mounting screws 8 3 System connection with controller NOTE A recommended connection sequence has been provided for maximum safety...

Page 7: ...ce will provide battery voltage to the loads DC loading could be LED lamp or monitor devices etc 1 Connect load1 positive and negative to the controller related terminals and connect load2 positive an...

Page 8: ...ause severe shock or injury Cover the solar module s from the sun before installing solar wiring CAUTION 1 If you can not confirm the scientific and rational PV module connection by series or parallel...

Page 9: ...e 2 wires from controller need connect to switch power Red wire is positive Black wire is negative polarity 2 Please make sure connection are correct with switch power related terminals 3 Switch power...

Page 10: ...power terminals are tightened Step 8 Power up sequence after confirmation of connection 1 Turn on battery firstly 2 Turn on solar panel 3 Turn on wind turbine 4 Turn on DC loading 5 Turn on switch po...

Page 11: ...ne 1 minute delay 4 If battery voltage lower than over discharge point no DC power output 5 As street lighting system while solar panel voltage higher than threshold voltage controller no DC power out...

Page 12: ...batteries Eb mean power volume of battery with percent format Uw meaning voltage of wind turbine but this value is DC voltage which be rectified voltage from wind turbine output Iw charging current f...

Page 13: ...d abnormal is troubleshooting the screen will automatically back to first browsing page content If the wind turbines in the brake protection status the screen display Tip Once the wind turbine brake a...

Page 14: ...the value each press means increase or reduce 0 1V Press ENTER to choose 11 3 Press ENTER key to next page Press key or key to adjust the number each press means increase or reduce 0 1V If set time ea...

Page 15: ...ill showing is 12v it was rectified value wind turbine output approximate 10vac 12v system will showing6 0v wind turbine output approximate 6vac Press key or key to adjust the number each press means...

Page 16: ...battery to power up controller This is intent to make sure the program running in you done modified setting condition PLEASE MAKE SURE NO CONNECTIION WITH WIND TURBINE AND SOLAR PANEL BEFORE SETTING...

Page 17: ...toT1 4 step T1 4 this process is balance of whole night time And turn off lamp while dawn This value would not show on LCD so this value is not adjustable Of course you could to cover this process by...

Page 18: ...ischarge Recovery Voltage 12V 24V 12 0V 24 0V adjustable Over charge Voltage 12V 24V 15 0V 30 0V adjustable Over charge Recovery Voltage 12V 24V 13 5V 27 0V adjustable 14 4 Output Set up function Each...

Page 19: ...rminals Inspect for loose broken or burnt wire connections Check and confirm that LCD is consistent with required Pay attention to any troubleshooting or error indication Take necessary corrective act...

Page 20: ...battery 2 Connected to the battery the controller does not output The battery voltage is below the release point Normal wait for the system to charge to the recovery point Access photovoltaic panels s...

Page 21: ...1 Damage by accident negligence abuse or improper use 2 PV or load current exceeding the rating of product 3 Unauthorized product modification attempted repair 4 Damage occurring during shipment 5 Dam...

Reviews: