
For questions or concerns, please visit us at www.sunoptics.com, or call your nearest Sunoptics representative.
SUNOPTICS
® | 6201 27th Street, Sacramento, CA 95822 | 916.395.4700 | 800.289.4700 |
www.sunoptics.com
Page 12 of 14
25.
Place butyl tape on the starter panel on all interface surfaces, see below in blue (both sides). Apply a ¼”
bead of metal construction sealant at the location seen below in orange (both sides).
26.
Place starter panel (#3) onto rails, then press down to make sure it is fully down in place.
27.
Place butyl tape on starter panel flange and rail as pictured below. Then apply an L‐shaped ¼” bead of
sealant at the location indicated below in orange on both sides.
28.
Place starter panel cap (#5) onto starter panel and secure down with (2) 1” concealer head screws (#11)
fastened vertically indicated by the green dot below. Then fasten horizontally with (4) 1.5” Concealer
Pancake Head w/ EPDM washer screws (#12) using the pre‐drilled holes as position indicators.