-------------------------------------------------------------------------------------------------------------------------------------------------------------------------
14
SUNONWEALTH ELECTRIC MACHINE INDUSTRY CO., LTD.
UFO 3 INSTALLATION (2019.12.23) V1
Tools Required for Installation
Fan Diagram
Mechanical Installation
Electrical Installation
Standard wrench/socket set
Phillips screwdriver
Standard Allen wrench set
Flat head screwdriver
Hydraulic cutter
Multimeter
Galvanized wire Ø4 mm (Trim the wire
length according to the situation)
Pair if #10 to #14 AWG strippers
Torque wrench 50~300 kgf.cm (For
inspection purpose)
Electronic level