5
/
8
Country of Origin: China
Hardware Pack 3
Fig.5
: Attach top beam 1
(
A
)
to top beam
2
(
B
)
, fix by using bolt
(
AA
)
a
nd washer
(
BB
)
.
Fig.6:
Fix
assemb
led
t
op
beam
1/
beam2
(A/B) to assembled Arc beam1/ Arc
beam2
(
C/D
)
,by using
bolt
(
EE
)
and washer (BB).
Fig.7:
Attach arc support 1
(
K
)
to short side beam1/ short side
beam2
(
C1/C2
)
, Arc support 2
(
L
)
to Arc be
a
m1/
Arc bea
m2
(
C/D
)
and arc support 1/ Arc sup
p
ort 2
(
L
)
to post1/ post2
(
H1/H2
)
,b
y
usin
g
bolt
(
EE
)
and washer
(
BB
)
.
GG
H010020014
M6 * 1
0
Bolt
4PCS
BB
H050010023
M6 Flat Washer
4PCS
DD
H010020024
M6 * 75 Bolt
8 PCS
FF
H070010008
Φ
6*230 floor stake
8 PCS
Fig.5
Fig.6
F1/F2
H1/H2
A/B
F1/F2
BB
EE
Step.3
Fig.8
Fig.10-1
Fig.10-2
Fig.9
Fig.12
R
P
O
Q
M
A
B
H2
BB
AA
C/D
K
L
EE
BB
BB
EE
Fig.7
Fig.11