4
/
8
Country of Origin: China
Fig.1‐1:
Put the
st
ake
cover
(
J
)
throug
h the post1/ po
st2
(
H1/H2
)
, up the s
t
ake cover (J), then attach s
take
(
I
) to post1/ post2
(
H1/H2
)
b
ottom
,
fasten by
us
ing bolt
(
CC
)
and washe
r
(
BB
)
.
Fig.2:
Attach
Arc beam1/ Arc bea
m2
(
C/D
)
to Arc beam Conne
ctor
(
E
)
, By usi
ng
bolt
(
AA
)
and washer
(
BB
)
.
Fig.3:
Attach Long side bea
m1
(
F1
)
to Long side bea
m2
(
F2
)
,by
using
bolt
(
AA
)
and was
her
(
BB
)
.
Fig.4‐1:
A
ttac
h con
ner
(
G
)
to top of p
o
st1/ post2
(
H1/H2
)
.
Fig.4‐2:
Attached
Arc
beam1/ Arc
beam2
(
C/D
)
to top of post1/ post2
(
H1/H2
),
then
fi
x
by using bolt
(
AA
)
and washer
(
BB
)
.
Fig.4‐3:
Atta
ch de
c
orate tu
be
(
N
)
to long side bea
m
(F1/F2
)
.
AA
H010020011
M6 * 15 Bolt
10PCS
BB
H050010023
M6 Flat Washer
52PCS
EE
H010110028
M6 * 40 Bolt
42PCS
Fig.4-1
Fig.4-2
Fig.4-3
G
H1/H2
CC
Fig.1
A
Fig.3
Fig.2
Hardware Pack 2
J
I
BB
BB
D
C
BB
AA
AA
BB
F1
F2
AA
BB
H1/H2
BB
AA
C/D
AA
BB
F1/F2
N
CC
Step.2
K
Fig.5
Fig.6
Fig.7
B
E
AA
BB
F1/F2
F1/F2
AA
BB
A
B
A
B
L