6
/
8
Country of Origin: China
Fig.8
: Attach canopy rod 1
(
O
)
to
t ca
n
opy rod 2
(
P
)
, fix by using bol
t
(
GG
)
and washe
r
(
BB
)
.
Fig.9
:Lay the canopy
(
R
)
on the te
n
t and pass the canopy rod 1/ canopy rod 1
(
O/P
)
throu
gh the canop
y
(
R
)
as showm.
Fig.10‐1
:First,insert the can
o
py rod 1/ canopy rod 1
(
O/P
)
into the rail bea
m
(
Q
)
,then
insert the rail
beam
(
Q
)
into the rail
connector
(
M
)
, finally lo
c
k rail beam
(
Q
)、
rail connector
(
M
)
and post1/ p
ost2
(
H1/H2
)
,by
using bol
t
(
EE
)
.
Fig.10‐2
: lock rail bea
m
(
Q
)、
rail co
nnector
(
M
)
and post1/ post2
(
H1/H2
)
by using bolt
(
EE
)
.
Fig.11
:
Fix the assembled gazebo on
gr
ound by usin
g
floor stake (FF).
Fig.8
Fig.9
Fig.10-1
Fig.10-1
Fig.11
BB
O
P
GG
O/P
O/P
R
O/P
R
Q
M
H1/H2
DD
DD
J
H1/H2
Q
R
H1/H2
J
FF
FF
I