User Manual
82
Grid
Contactor
09:00 am
–
09:30 am
DO relay
ON1
COM1
Inverter
DO port
Fig. 10-2
DO Operation in Timer Control
ON/OFF Control
In this mode, the system will control
the load operation according to the
setting. Set to
OFF
in the following
example.
2/2
ON/OFF
ON
OFF
Load Control
Timer
ON/OFF
Optimized
1/2
Grid
Contactor
OFF mode
DO relay
ON1
COM1
Inverter
DO port
Fig. 10-3
DO Operation in ON/OFF Control
Optimized Control
The system will control the load operation
according to the power optimization algorithm of
energy management.
During the setting interval, the DO function will be
enabled to power on the load if the excess PV
energy exceeds the
optimized power value.
Notice:
Load Control
Timer
ON/OFF
Optimized
Start time
End time
09:00
09:30
Optimized
P2/2
Power[W]
1000
1/2
The optimized mode is disabled in an off-grid system.