52
1
Insert block
①
into AC connector
②
from the side.
2
Tighten the screw on the bottom of block
①
.
step 5 Connect PE cable to ground.
step 6 Connect phase cable and “N” cable to AC circuit breaker.
step 7 Connect AC circuit breaker to utility grid.
step 8 Make sure all AC cables are firmly installed via the right torque tool or dragging the cables
slightly.
- - End
6.6
DC Cable Connection
The PV string will generate lethal high voltage when exposed to sunlight.
•
Respect all safety instructions listed in relevant documents about PV strings.
User Manual
Summary of Contents for SH10RT
Page 2: ......
Page 6: ......
Page 12: ......