42
No.
Label
Description
3
BMS/CAN
To enable the communication between the inverter and
the Li-ion battery
4
Enable
Connect to the LG Chem Li-ion battery
,
use with
RS485 terminal
5
DI/DRM
•
"AU"/"NZ":
Demand
response
enabling
device
(DRED)
•
"IT": interface protection system (SPI)
•
"DE": Ripple Control Receiver (RCR)
6
DO
•
Connect to an external light indicator and/or buzzer
to signal an alarm.
•
Connect to home load (such as SG Ready Heat
Pump) for power management.
(1) When the inverter is connected to a third-party monitoring device, please confirm which
communication interface is used, and whether it will cause loss of certain functions of the
inverter.
(2) When RS485 (A1, B1) is used for parallel connection in the master inverter, the LG Chem
battery (that uses RS485 for communication) cannot be used with the master inverter. It can
still be used with the slave inverter.
6.3
Electrical Connection Overview
System Wiring Diagram
The electrical connection should be realized as follows:
(A) Router
(B) Battery
(C) PV string
(D) Inverter
(E) AC circuit breaker
(F) Smart Energy Meter
(G) Grid
(H) Backup loads
(I) Monitoring device
User Manual
Summary of Contents for SH10RT
Page 2: ......
Page 6: ......
Page 12: ......