45
6.9
Finishing Electrical Connection
After the electrical connection, check the connections of all cables for
correctness and firmness.
After checking that all connections are correct and firm,
•
Close the cable entries on the bottom of the module by following the reversed
procedure in opening the cable entries.
•
The gap at the cable inlet/outlet at the bottom and right of the MV Station should be
sealed with fireproof mud.
•
Water-proof treatment should be performed on the foundation of the MV Station.
System Manual
Summary of Contents for SG4950HV-MV
Page 2: ......