36
Wiring Area
Note: The figure is for reference only, and the actual product may differ.
Wiring Steps
step 1 Drill holes on the bottom sealing plate of the HV cabinet according to local standards and
regulations.
step 2 Lead external cables inside through the bottom cable entries.
Each of the three-phase (phase H1, phase H2, and phase H3) cables is led inside through
the same cable entry.
step 3 Prepare the terminals and install them tightly, where reference can be made to the
installation manual of the cable connector.
Both cooper-core cable and aluminium-core cable are applicable.
In case of copper-core cables, use copper wiring terminals.
In case of aluminium cables, use copper-to-aluminium adapter terminals.
A maximum of 2x2 output cables can be connected to the HV wiring copper bars, i.e., the
outer copper bar (shown by 1), and the inner copper bar (shown by 2).
System Manual