User Manual
22
The lifting rings and the sling are not within the delivery scope.
4.5 PV Bracket-Mounted Installation
4.5.1 Preparation before Mounting
Tools
Item
Specification
Phillips
screwdriver/
electric screw driver
M4, M6
Marker
-
Level
-
Hammer drill
Drill bit:
φ
12
Socket wrench
Including 16mm socket
Spare parts
Item
Quantity
Specification
Source
Grub screw
2
M4
×
10
Delivery scope
2
M6
×
65
Delivery scope
Bolt assembly
4
M10
Delivery scope
4.5.2 Mounting Steps
Step 1
Assemble the mounting-bracket by using the connecting bar.
M4
1.5N.m
Step 2
Level the assembled mounting-bracket by using the level, and mark the
positions for drilling holes on the PV bracket. Drill the holes by using a
hammer drill.