37
Outer diameter D(mm)
Seals
20~25
a+b+c+d
25~30
a+b+c
30~40
a+b
40~50
a
step 3 Strip the protection layer and insulation layer by specific length, as described in the figure
below.
step 4 Make the cable and crimp OT/DT terminal,refer to
.
step 5 Unfasten the buckle and remove the protective cap.
step 6 Secure the wires to corresponding terminals.
Observe the terminal layout on the block. Do not connect the phase wires to "PE"
terminal or PE wire to "N" terminal. Otherwise, unrecoverable damage to the inver-
ter may follow.