User Manual
16
Forward tilt
Backward tilt
Horizontally
Upside down
4.2.4 Installation Clearance Requirements
Reserve enough clearance around the inverter to ensure sufficient space for
heat dissipation.Clearance requirement and multiple installation:
400 mm
400 mm
400
mm
800
mm
For multi-row installation, the distance between two adjacent rows should be at
least 400 mm.
4.3 Installation Tools
Installation tools include but are not limited to the following recommended ones.
If necessary, use other auxiliary tools on site.
General tools (recommended)
Marker
Measuring tape
Level
Utility knife
Multimeter
Measurement range:
≥
1100Vdc
880.0
Wrist strap
Summary of Contents for SG2K-S
Page 2: ......