36
7.5
Operation Procedure
Perform the following operations before logging into the Logger1000 Web for the first time.
step 1 Complete the electrical connections.
Ensure that the Logger1000 has been correctly connected to other devices. Refer to the
chapter
.
step 2 Configure serial ports of the Logger1000.
After logging into the Web, first configure the serial ports of the Logger1000, to ensure that
the Logger1000 can normally communicate with upstream devices. Refer to the chapter
.
step 3 Calibrate the system time.
Check whether the current system time is correct, and perform manual time synchronization
or automatic time synchronization when necessary. Refer to the chapter
.
step 4 Automatically search the device.
Devices that can be automatically searched, such as SUNGROW string inverter, can be
added via the auto search function with addresses allocated automatically. Refer to the
chapter
.
step 5 Add the device. Refer to the chapter
.
step 6 Configure forwarding service.
User Manual
Summary of Contents for Logger1000
Page 2: ......
Page 6: ......
Page 10: ......
Page 94: ...M H 001405 www sungrowpower com Sungrow Power Supply Co Ltd...