25
Prepare two appropriate Ethernet cables. Connect the cable led from the Smart Energy
Meter to a port of the core switch.Connect one end of the other Ethernet cable to another
port of the core switch and the other end to the "ETH" port of the Logger1000.
If there is no core switch connected on site, connect the cable led from the Smart
Energy Meter directly to the "ETH" port of the Logger1000.
The farthest effective transmission distance of the network cable is 100m, and it is
recommended that the actual distance should be no more than 90m. CAT 5E
cable or network cable with higher category is recommended.
5.3.4 Connection to Meteo Station
Meteo Station includes standard Meteo Station and discrete Meteo Station. The discrete
Meteo Station consists of several sensors.
It is recommended to use Meteo Station complying with Modbus protocol. Meteo Station can
be connected to Logger1000 through RS485 port or AI port. The recommended Meteo
Station types are as follows:
No.
Type
Wiring
1
PC-4
2
PC-4 PRO
3
WING-TRACKER
4
WS601
5
SMP10
6
RT1
7
PVMet75
8
PVMet200
9
Si-RS485TC
10
TEMPER_SENSOR
11
Meteo sensor
RS485 Connection
The following figure shows the connection between the Logger1000 and the Meteo Station.
Connect the communication cable led from the Meteo Station to the RS485 port of the
Logger1000.
User Manual
Summary of Contents for Logger1000
Page 2: ......
Page 6: ......
Page 10: ......
Page 94: ...M H 001405 www sungrowpower com Sungrow Power Supply Co Ltd...