background image

 

8

 

 

 

5   Mechanical Installation 

5.1   Unpacking and Inspection 

Check for completeness of the scope of delivery according to the packing list in 
the carton. 

A

B

D

G

C

E

F

H

 

Fig. 5-1 

Scope of delivery 

No 

Name 

Description 

local controller 

Enclosed 
documentation 

User  manual,  delivery  inspection  records,  packing 
list, warranty card, and quality certificate 

Communication 
terminal 
resistor 

12x120

Ω 

Note:  When  the  RS485  bus  is  connected  to  more 
than 15 devices, it is recommended to connect 120-

Ω 

terminal resistors in parallel to cables A and B on the 
two ends of the bus 

Network Cable 

Length: 1x2m

 

Hanger 

Fastener 
combination 

Cross recessed pan head tapping screws 

OT terminal 

RNBL5-4 

Nylon    cable 
tie 

Fastening cables 

Summary of Contents for EMS200

Page 1: ...EMS200 V12 UEN Ver11 201812 EMS200 Local Controller User Manual...

Page 2: ......

Page 3: ...and Inspection 8 5 2 Requirements for Installation Location 9 5 3 Installation 9 5 3 1 Rack Mounting 9 5 3 2 Wall Mounting 10 6 Electrical Connection 12 6 1 General Safety Regulations 12 6 2 Terminal...

Page 4: ...8 7 1 System Parameters 25 8 7 2 Operating Parameters 26 8 7 3 Communication Parameters 26 8 7 4 Slave Unit Parameters 27 8 7 5 Protection Parameters 28 8 8 History Records 29 8 8 1 Running Records 3...

Page 5: ...m Information on BCP 39 10 2 4 Other Alarms 40 10 3 Fault Diagnosis 41 10 3 1 Fault Information on Power Conversion System PCS 41 10 3 2 Fault Information on Grid 43 10 3 3 Other Faults 43 11 Appendix...

Page 6: ...IV...

Page 7: ...bited without prior written authorization of our company The content of the manual is constantly updated or revised and the description in this manual may slightly deviate from the actual product or e...

Page 8: ...risk which if not avoided could result in minor or moderate injury NOTICE indicates a situation which if not avoided could result in equipment malfunction or property damage NOTE indicates additional...

Page 9: ...ry and property damage and to ensure long term operation of the local controller read these symbols carefully Only electrically qualified persons can operate and wire the device Before Installation Af...

Page 10: ...is voltage free Before the electrical connection disconnect input switches upstream and ensure that the local controller is voltage free Maintenance and replacement Only persons from the service depar...

Page 11: ...ation to the energy management system via the background so as to facilitate the management of energy storage system Main functions Data collection Data forwarding Device management Micro grid operati...

Page 12: ...RUN Running indicator RUN indicator flashes running is normal RUN indicator is off running is abnormal BLE Bluetooth indicator Reserved function FAULT Fault indicator FAULT indicator is on the system...

Page 13: ...ion of the installation procedure Procedure Reference section Unpacking and inspection 5 1 Select an optimum installation site and perform mechanical installation 5 3 Electrical connection 6 Checking...

Page 14: ...er manual delivery inspection records packing list warranty card and quality certificate C Communication terminal resistor 12x120 Note When the RS485 bus is connected to more than 15 devices it is rec...

Page 15: ...al components can be damaged Take proper damp proof and anti corrosion measures 5 3 Installation The local controller can be installed at any indoor locations provided that the requirements above are...

Page 16: ...during the whole installation process Tilting or falling of the device caused by inappropriate operations could result in personal injury It is recommended to install the local controller at a locati...

Page 17: ...ng screws onto the marked positions on the surface Step 4Hang the local controller onto the tapping screws via the screw holes on the hangers Step 5Fasten the tapping screws by using the torque screwd...

Page 18: ...3 1 3 DO4 2 2 2 A1 B1 A2 B2 A3 B3 A4 B4 A5 B5 A6 B6 GND PT1 GND PT2 AI1 AI2 AI3 AI4 H L CAN 24V AC L AC N GPS BDS RF L1 L2 DO 1 2 3 NO NC COM Tab 6 1 Terminal description Item Remark Name Description...

Page 19: ...to slave devices or background J CAN CAN communicatio n port Function is reserved K 24V DC24V power supply port Current 2 0A and the switch mode power supply used for this port should be insulated int...

Page 20: ...nt grounded 0 2mm the maximum cross sectional area of the shielded twisted pair 1 2mm and the recommended stripped length of the cable is 8mm Keep at least 0 5m away from the strong electricity Avoid...

Page 21: ...he PCS Connect both the local controller and to be connected devices to the switch through ETH1 and corresponding network ports where Modbus TCP communication protocol is supported IP addresses of all...

Page 22: ...controller and the IP address cannot activate the DHCP function 6 5 Protection Earthing Connection The grounding cable must be well grounded Otherwise Lethal electrical shock occurs to the operator in...

Page 23: ...he AC power supply for example Step 1Prepare power cables and phoenix terminal Specifications of the AC DC cables are shown in the following table Cable Recommended cross sectional area AC cable Cross...

Page 24: ...5 Electrical Connection User Manual 18 The local controller can connect to the DC and AC power at the same time The DC power can be connected to the UPS and used as the standby power supply...

Page 25: ...ss of the port is 192 168 1 100 of the local controller by using the cable Log into the local controller operation interface via the IE browser or the Google browser 4 Ensure that the device is firmly...

Page 26: ...t as that of the local controller Connect the PC to the port ETH2 of the local controller The default IP address of the port ETH2 is 192 168 1 100 IP address of the PC can be set to 192 168 1 125 when...

Page 27: ...ghter corner of the interface 8 4 WEB Main Interface The WEB interface is shown in the following picture A C D E B F G H I Item Name Description A Username Display the current login user B Operating i...

Page 28: ...formation Specific classifications of the administrator menu is shown in the following figure WEB Main Interface Operating Information Parameters Settings History Records System Information Summary In...

Page 29: ...d includes Summary Information PCS Information BMS Information and Detail Information 8 6 1 Summary Information The summary information interface differs due to different system configuration interfac...

Page 30: ...il Information The Detail Information includes operating information of the whole system for example total active power of the PCS 8 7 Parameter Settings The Parameters Settings are used to set parame...

Page 31: ...r Energy adjust Set the energy adjustment value Load default param Enter the set password 1111 to restore factory defaults User param bak Enter the set password 1111 to backup current system configura...

Page 32: ...Description Mode setting Set to Running Mode Power Control Mode Grid Power or Off Grid power Q ac regulation That includes Close Power Factor and Q ac Power BMS control Setting closing or opening of t...

Page 33: ...ed to the corresponding port If the PCS communication cable is connected to the serial port 1 the PCS is selected as the device type for the serial port 1 The start ID is set to 1 and the end ID is se...

Page 34: ...t 1 2 level alarm recovery value SOC hysteresis control SOC control delay time s delay of triggering battery SOC alarm SOC control recover time s SOC alarm recovery delay Vbat Parameters Disabled If i...

Page 35: ...elay time s delay of triggering battery voltage alarm Vbat control recovery time s Vbat alarm recovery delay Air Condition Param Set alarm temperature thresholds 8 8 History Records The History Record...

Page 36: ...atically records once every minute The records within specified time can be queried and the CSV export format is supported 8 8 2 Event Records The Event Records include a maximum of 10 000 history rec...

Page 37: ...ystem automatically records The records within specified time can be queried and the CSV export format is supported 8 8 4 Alarm Records The Alarm Records include a maximum of 10 000 history records Wh...

Page 38: ...sword Changing User type Permission Operator Can view running information but cannot set parameters Maintainer Can view running information and set parameters but cannot change passwords of subordinat...

Page 39: ...neral Safety Rules Only approved qualified persons can service the local controller Do not leave any screws washers or other metallic parts inside the local controller Otherwise the device can be dama...

Page 40: ...y voltage is normal Check to ensure that the cables are connected firmly Check to ensure that the cable is grounded well System cleaning Clean the enclosure circuit board and components Clean the heat...

Page 41: ...ller Brief fault description Pictures of the fault site The ground cable must be grounded well otherwise Fatal electric shock may occur to the operators 10 2 Alarm Diagnosis 10 2 1 Alarm Information o...

Page 42: ...s enabled 3 Check whether voltage equalization is invalid PCS not Ready Alarm 1 The PCS is faulty 1 Check whether PCS has a fault 2 An emergency stop occurs on the PCS 2 Check whether the PCS is in th...

Page 43: ...ter is set to an appropriate One or More High Battery Level1 Battery voltage SOC is higher than the Vbat Uplimit1 1 Reduce charging power In the on grid mode the local controller will limit the chargi...

Page 44: ...there is no standby state but the charging power is not affected In the off grid mode the user side EMS needs to stop the external power being fed into the system 2 Check whether the protection param...

Page 45: ...ess of the BMS are correctly set 3 Check whether the serial port via which the BMS is connected to the local controller is correctly configured BMS Fault Alarm The battery system or Rack is faulty Ref...

Page 46: ...Alarms Alarm Possible causes Measures Node collector Comm Fault Alarm Communication between the PCS dry contact and the local controller failed 1 Check whether the communication cable connecting the...

Page 47: ...on T Lowlimit Value 1 Check whether the air conditioner in the battery container is faulty 2 Check whether the parameters such as Air Condition T Uplimit Value or Air Condition T Lowlimit Value are ap...

Page 48: ...to PCS not Ready Alarm Micro start timeout 1 The PCS is in the local mode 1 Check whether the PCS is in the local mode 2 Communication between the PCS and the local controller is abnormal 2 Check whet...

Page 49: ...ault Possible causes Measures Upper Computer Comm Err Communication between the local controller and the user side EMS times out 1 Check whether the communication cable between the local controller an...

Page 50: ...ocal controller is not connected to the power source 1 Check whether the power cable connecting the local controller is firmly in place 2 The power source is faulty 2 Replace the power source 3 The lo...

Page 51: ...anner RS485 and Ethernet Max communication distance RS485 1000m COM1 COM6 Ethernet 100m Other parameter Display WEB and LED indicator Language Chinese English Power supply AC100 to 240V 50 60HZ or DC1...

Page 52: ...e warranty period SungrowSamsung Hefei will require the customer to present the purchase invoice and date The trademark on the product shall be clearly visible Otherwise SungrowSamsung shall hold no l...

Page 53: ...Information Should you have any questions or queries about this product please contact us through the following information We will be more than happy to assist you Company Sungrow Samsung SDI Energy...

Reviews: