10
N
No
o..
N
Na
am
me
e
N
No
otte
e
1
Marker
Beyond the scope of delivery
2
Hammer drill
Beyond the scope of delivery
3
Bottom supporter
In the scope of delivery
4
Mounting ear
In the scope of delivery
5
Expansion bolt
In the scope of delivery
6
Tapping screw
In the scope of delivery
7
Screwdriver
Beyond the scope of delivery
IIn
nsstta
allll M
Mo
ou
un
nttiin
ng
g E
Ea
arrss a
an
nd
d B
Bo
otttto
om
m S
Su
up
pp
po
orrtte
errss
Anchor the mounting ears and bottom supporters to the device with supplied M4x8
cross recessed countersunk head screws. The fastening torque is 1.8-2.4N·m, and
the anchoring method is as follows:
M
Mo
ou
un
ntt tth
he
e d
de
evviic
ce
e tto
o tth
he
e W
Wa
allll
step 1
Mark positions for drilling holes on the installation wall. Drill the holes with a hammer drill
of φ6mm. (Note: Reserve sufficient clearances around the device.)
step 2
Insert the expansion sleeve into the drilled hole, and make it completely embedded in
the wall with a rubber hammer.
step 3
Insert the tap screw and mounting ear successively into the expansion sleeve, to fix the
device onto the wall.
User Manual