18
6
Commissioning
6.1
Inspection before Commissioning
N
No
o..
IIn
nssp
pe
ec
cttiio
on
n iitte
em
m
R
Re
essu
ulltt
1
All cables are intact, well-insulated, and
appropriately dimensioned
□
2
All cables are connected correctly and firmly
□
3
The polarity of the power supply cable is
correct. The grounding cable is reliably
grounded
□
6.2
Commissioning Steps
N
No
o..
D
De
essc
crriip
pttiio
on
n
R
Re
essu
ulltt
1
Inspection before commissioning
□
2
Power on the BSC.
□
3
Connect the debugging PC to the ETH2 (-
default IP address of the port is
192.168.1.100) of the BSC by using the cable.
Log into the BSC operation interface via the
Google browser.
□
4
Ensure that the device is firmly connected to
the BSC.
□
5
Perform system networking configuration
and communication parameter configuration
on the WEB page, where the type of actual
connected device, operation strategy, and
the like are consistent with actual system
requirements.
□
6
The system starts commissioning. Observe
whether the device communication
parameter is normal.
□
Devices connected to the same communication port must have different
addresses.
Save the settings, otherwise, the settings will not take effect.