background image

5

INSTALLING YOUR SUNGRABBER

TM

(CONTINUED) 

HORIZONTAL INSTALLATION ON SHINGLE ROOF  [P/N’S 260-1, 260-2, 260-5, 260-6]

CAUTION:  VERTICAL INSTALLATION OF THESE MODELS WILL VOID THE WARRANTY 

1.  Determine the location of your panel(s).  Lay out your 

system so that it declines slightly (a minimum of  1/4 inch of 
fall every 10 feet) toward the bottom corner of the panel that 
feeds from your pool equipment.  This is needed to ensure 
proper drainage during daily use and for winterizing. 

2.  The three mounting straps provided should be positioned 

with one in the center of the panel, and one 5” in from each 
header.  Mark the bottom row lag screw locations.  Position 
the first strap with 10” of under-hang below the lag screw 
location, drill an 1/8” pilot hole, remove strap, apply adhesive 
to the pilot hole, re-position the strap, and screw the lag 
screw through the strap into the roof.  Install remaining two 
straps the same way.  In Step 8, you will use the 10” 
underhang strapping and the same lag screw to secure 
supply piping. (see photos 2) 

3.  If this is a multiple panel system, connect all the panels 

using the rubber couplers and hose clamps provided with 
your system.  Make sure each coupler is pushed on at least 
an inch past the raised ribs of the header adapters.  Position hose clamps 1/4” from the end of the couplers and tighten. (see 
photo 3) 

4.  Install the rubber cap and stainless steel clamp over the header adapter at the bottom corner of the system that will not have 

plumbing running to it. (see photo 4) 

5.  Install the VRV and bell reducer as shown onto the upper most corner of the top panel that will 

not have plumbing running to it. (see photo 5) 

6.  Install rubber couplers and clamps on the opposite corners that will receive plumbing.  Insert 1-

1/2” Male Ribbed Adapters (MRAs) with barbs into the coupler and secure with a hose clamp. 
(see photo 6) 

7.  Follow Steps 1 and 2 for mounting remaining straps. 

8.  Construct plumbing as shown.  Use extra strapping at the bottom to hold supply piping.  
        (see photos 8) 

ATTENTION:  P/N 250-1 HIGH WIND ROOF/RACK MOUNTING KITS may be purchased from your 
dealer and used in high wind applications in addition to the roof/rack mounting hardware 
included in your system.  One kit is required for every two panels used in a system; one 
additional kit is required to complete the system.  (Example: A system with (8) 2’ panels requires     

 5 

kits) 

8. 

5. 

8. 

4. 

6. 

2.

2.

3. 

:

:$50
:$7(5
72322/

&

&22/
:$7(572
62/$5
3$1(/

),/7(5$1'
3803

&

&22/

:$50

6:,00,1*322/

6

62/$5+($7

6

62/$5+($7

A MINIMUM OF 1/4 INCH OF FALL P

ER 10 FEET

Summary of Contents for IN-GROUND

Page 1: ...LDINGS OR RESIDENTIAL HOMES UNLESS YOU ARE FAMILIAR WITH WORKING ON ROOFS AND HAVE THE PROPER LADDERS AND SAFETY EQUIPMENT FOR SUCH WORK YOU SHOULD HIRE SOMEONE WITH THE NECESSARY EXPERIENCE TO DO THE...

Page 2: ...added each time your pool water circulates through the solar panel s If your pool water is too warm circulate the pool water through the solar panel at night to cool your pool WHY IS SUNGRABBERTM YOUR...

Page 3: ...clamp A B C D E 2 3 9 2 4 1 2 x 10 in ground solar panel 60 mounting straps 2 x 1 4 mounting screws 1 1 2 rubber coupler 1 1 2 hose clamp P N 267 System Kit Additional Parts Required 1 System Kit PVC...

Page 4: ...solar panels either horizontally 20 panels or vertically 10 and 12 panels When transporting panel s to the roof or rack and while positioning panel s before mounting be sure they are not dragged over...

Page 5: ...system Make sure each coupler is pushed on at least an inch past the raised ribs of the header adapters Position hose clamps 1 4 from the end of the couplers and tighten see photo 3 4 Install the rubb...

Page 6: ...strap apply roofing mastic over the pilot hole re position the strap and screw lag screw through the strap into the roof see photos 2 7 8 Position the panel under the strap pull the strap tight acros...

Page 7: ...re a good seal and to avoid bending the metal surface If screw heads protrude above the surface of the roof a substrate must be used to prevent damage to the panels Rubber or Asphalt Modified This typ...

Page 8: ...and allow the system to drain Reattach your VRV SunGrabber TM panels are designed to be left in place through the winter months as long as they are drained If you question the drainage of your system...

Page 9: ...or heat pump Answer If you have a gas heater or heat pump installed on your pool currently simply install your SunGrabberTM between the filter and the gas heater heat pump You will notice a reduction...

Page 10: ...Notes...

Page 11: ...Notes...

Page 12: ...SunGrabberTM 866 SUNGRAB 866 786 4722 435 Otterson Drive Chico CA 95928 www sungrabber com P N 07347C 3 06...

Reviews: