Page 16
680 EXPORT SERIES
10. Install control box door and screws and reinstall the cabinet side
panels.
Figure A
Equipment Area
3
2
2
5
5
1
7
4
6
WARNING!
DONOT LOOK AT LIT BULB
SEVERE EYE DAMAGE
OR BLINDNESS CAN OCCUR
9
8
1. Control Box
2. Power Supply Inlet(s)
3. 2-Speed Pump
4. Heater
5. Pump Drain Plugs
6. 1-Speed Pump
7. Control Panel
8. CLEAR
RAY
(Ultraviolet) Water
Purification System
9. Electronic Ballast (For the CLEAR
RAY
System)
Note:
Equipment location (such as pumps,
CLEAR
RAY
® system, drain, heater etc.) varies
by model.
Figure B
Control Box
TB1
3
2
1
1. Terminal Block
2. Bonding Lug
3. Grounding Terminal
Summary of Contents for Denali 680 Series
Page 6: ...680 EXPORT SERIES ...
Page 60: ...Page 54 680 EXPORT SERIES ...
Page 61: ...680 SERIES BENUTZERHANDBUCH Denali Edison McKinley Peyton Ramona Tacoma P N 6530 681EB Rev A ...
Page 66: ... ...
Page 128: ...Seite 62 680 EXPORT SERIES ...
Page 134: ...680 EXPORT SERIES ...
Page 194: ...Page 60 680 EXPORT SERIES ...
Page 200: ...680 EXPORT SERIES ...
Page 259: ...Pagina 59 English Français Deutsch Nederlands 680 EXPORT SERIES ...