14
Cluster Platform 15K/9960 System Site Planning Guide • January 2002
Sun Fire 15K servers, refer to the Sun Fire 15K Site Planning Guide. For the power
connections for the Sun StorEdge 9960 storage system, refer to the Hitachi Freedom
Storage Lighting 9900 User and Reference Guide.
Note –
The system is acceptable for use on TN [neutral connected to earth (terra),
protective conductor connected to neutral]; and IT [neutral connected to earth
(impedance), protective conductor connected to earth (terra)] power systems.
TABLE 4-1
Facility Power Requirements for the Cluster Nodes
Electrical Service
Specification
Voltage
200–240 VAC, single phase
Frequency
47–63 Hz
Circuit breaker: North America and Japan
Circuit breaker: International
30 circuits at 30A
30 circuits at 32A
Current drawn
23760 VA (max load)
Power cords (15 ft. maximum)
30
Receptacle: North America and Japan
Receptacle: International P/N 180-1944-01
NEMA L6-30R or equivalent
IEC 309, single phase, 32A
TABLE 4-2
Facility Power Requirements for the Storage Array
Electrical Service
Specification
Voltage at 60 Hz
200, 208, 230 VAC, three phase
Voltage at 50 Hz
200, 220, 230, 240 VAC, three phase
Voltage at 50 Hz
380, 400, 415 VAC, three phase
Frequency
47–63 Hz
Circuit breaker: North America and Japan
Circuit breaker: International
2 circuits at 30A
2 circuits at 32A
Current drawn (controller)
2410 VA (max load)
Current drawn (disk array)
3720 VA (max load)
Power cords (15 ft. maximum)
2
Receptacle: North America and Japan
R&S 3754
Summary of Contents for 15K/9960
Page 4: ...Please Recycle...
Page 8: ...viii Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Page 10: ...x Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Page 12: ...xii Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Page 14: ...xiv Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Page 20: ...xx Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Page 22: ...2 Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Page 28: ...8 Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Page 32: ...12 Cluster Platform 15K 9960 System Site Planning Guide January 2002...