Set the connector on the Guide jig and preparation of removing cable jacket
45mm
Refer to previous
page of removing
cable jacket procedure
②Set
ESC Spacer
!
③Contact ESC Spacer
④Close Cover
Fiber Cleaving Procedure
Draw
No Gap
!
!
!
Take the connector out
from jig after closing cover
completely
Good
【
2
】
Set the holder on cable-end
Cross section
✓
✓
✓
2x3mm
cable
1.6x2mm
cable
Check cable set position
Keep straight
!
Close the cover
【
3
】
Remove
φ
0.25mm-fiber jacket
【
4
】
Cleave fiber
No Gap
No Gap
!
【
5
】
Insert fiber into the connector
Close the
cover
Release the wedge
【
6
】
Completion
No Gap
Set the holder on
E-SC Cut Spacer.
(*Arrow Mark
upside)
!
Check dimension(If dimension is
not correct, return to 1st procedure)
Clean Bare fiber with a lint-free
gauze pad moistened with pure
alcohol. (Do not use dirty gauze.)
±30°
degree
Screen fiber
①Press
Slider
Check the bend to assure
the fiber is firmly contacted
Click!
(*Arrow Mark
upside)
Set the holder on the Insertion guide jig
Click!
Click!
8~10.5mm
25
~25.5mm
*Re-assemble Procedure
*Check the cover
latching completely
④Twist B right and left
to open the cover
①set the wedge on
the connector again
②
Grip the connector like
lower picture to avoid
releasing the wedge
③Fit A to A’ then put B to B’(slits)
⑤Open the cover , then
pull the cable holder
⑥Check the fiber
length is correct or not.
*If it is correct , the
connector can be re-used,
return to 1st procedure.
incomplete
Cross section
Incomplete
Assembly performance can be
checked by visual light source
(*recommended power is
<0.25mW@650nm)
A’
A’
A
A
B
B
B’
B’
<Note> In order to open cover, protrusion of jig(B)
must be inserted into slit area(B') between
connector body and cover, and do ④. It is helpful
to fit connector end edge(A') to jig corner area(A)
during this work easily.