Installation and Operating Instructions
40002 Inline and Channel Series
40002_Inline_and_Channel_Series_EN_20201208_V01.docx
13
Cleaning / Inspection
It is important to periodically inspect the grinder (timeframe dependent on usage).
1.
Steam clean and disinfect all parts of the unit excluding motor, seal assemblies,
gear drive unit and bearings.
2.
Remove any gasket material from joint faces.
3.
Housings should be cleaned thoroughly.
4.
Inspect all parts for excessive wear.
5.
Inspect gears for wear and damage.
6.
All cutters and spacers must be clean and free from cracks or excessive wear.
7.
Shafts should be clean and any burrs filed off for easier stacking. Inspect shafts
for excessive wear of hexagonal portion.
Contact the Sulzer service department if any of the above requires replacement.
Re-assembly advice
1. Lubricate gears on re-assembly with the specified lubricant.
2. Re-connect wiring at motor(s) terminal box(es) using tag leads for identification.
3. Re-open system isolation valves.
4. On completion of assembly, run through the ‘initial start-up’ procedure.
Extended shutdown
For extended shutdown refer to the Inspection / Storage section.
Attach lifting equipment and remove the grinder