
19
Free-AIr-3-IN
© STULZ SpA – all rights reserved EN/02.2018
4. After making openings on room walls, protect them against water (rain) infiltrations suitably.
5. Glue the adhesive gasket (supplied with the unit) around the edge of the air openings drilled on
the wall. Gasket is made of ethylene-propylene, open cell, with 3 mm thickness and 10 mm width.
6. Place the FCL against the wall so that openings on its rear side correspond to the cut-out on
the wall. Then, secure it with M6 screws and the supplied fixing bracket as it is shown below.
Generally the installation is realized with two horizontal fixing bracket, but it is possible to perform
a lateral fastening using fixing bracket (on request) to be applied on the fixing holes on the later
side of the unit and into the wall.
ATTeNTION
Do not block off circulation of air intake and/or expelled by the Free-Air-3-IN.
Fixing bracket with L shape
(supplied by STULZ)
Fixing bracket with L shape
(supplied by STULZ)