
25
125
235
90
© STULZ GmbH – all rights reserved EN/02.2018/G17F
cyberlab original instructions
Insertion for the power supply cable
Connection of the power supply cable
• route the power supply cable in the unit as shown in the following illustrations and fix it at the unit frame.
• route the electric cable into the electrical box from below and connect the PE conductor at the PE rail, the
neutral conductor at the neutral terminal and the three phases to the main switch, in accordance with the
wiring diagram (part of the unit documents).
• secure these cables by the pull relief screw.