construction sizes 5 - 7
For the transport, lifting lugs are mounted at the base frame where the ropes/belts must be attached. The
number of lifting lugs varies according to the construction size.
The lifting device must consist of two cross beams.
The drawings on the following pages show the dimensions for the suspension points and the position of the
centre of gravity.
Suspension at the lifting lugs
• After installation, remove the lifting lugs and keep them for future transport.
notice
•
consider also the weight of the cross beams when you order the crane.
•
The rope forces are higher than the weight forces according to the geometry.
• Due to the risk of scratching the side planking, we advise, not to use chains.