26
6500-509-001 REV B
www.stryker.com
Figure 8: In-Fastener Shut-Off Module
INSTALLING THE IN-FASTENER SHUT-OFF
WARNING
The in-fastener shut-off must be positioned properly before
placing the cot into service. Failure to install the in-fastener
shut-off may cause injury to the patient or operator and/or
damage to the vehicle.
The cot and fastener system have an integrated in-fastener
shut-off function that disables the cot motor when the cot is
secured into the cot fastener. Securely tighten the bolts on
the fastener before installing the shut-off bracket. Install the
shut-off bracket onto the rail clamp assembly before putting
the cot into service.
1. Place the cot into a loading position (any position where
the load wheels of the head section meet the vehicle
floor height).
2. Lift the vehicle bumper to the raised position (if equipped).
3. Roll the cot to the open door of the patient
compartment.
4. Push the cot forward until the load wheels are on the
compartment floor and the safety bar passes the safety
hook.
3. For maximum clearance to lift the base, pull the cot back
until the safety bar engages the safety hook.
4. Raise the base and push the cot into the patient
compartment following the appropriate loading
instructions.
5. Engage the
extended
head section of the cot into the cot
fastener antler and secure the cot post into the fastener
rail clamp.
6. Adjust the shut-off bracket along the rail clamp until the
“diamond” on the sensor housing is lined up with the pop
rivet head as shown in Figure 7.
7. Using a T27 Torx wrench, securely fasten the bolts to
attach the shut-off bracket to the rail clamp assembly.
8. Press the retract (–) button to ensure that the motor does
not turn on while the cot is in the fastener. The battery
indictor will still illuminate. If the motor turns on, readjust
the shut-off bracket.
WARNING
• Do not attempt to operate the cot when it is loaded into
a cot fastener.
• The in-fastener shut-off is
only
a means for disabling
the electronic functionality. Damage to the product and/
or injury to the patient and/or operator may occur if used
for any other purpose.
• Any emergency vehicle to be used with this cot
must
have
the in-fastener shut-off system installed.
Cot Fastener Installation
Figure 7: Cot Engaging Cot Fastener
Note:
Align the ‘diamond’ (A) on the sensor
housing cover with the pop rivet head (B) on the
in-ambulance shut-off.
A
B
Summary of Contents for Power-PRO XT 6500
Page 2: ......
Page 90: ...90 6500 509 001 REV B www stryker com Return To Table of Contents Cot Assembly ...
Page 91: ...www stryker com 6500 509 001 REV B 91 Return To Table of Contents Cot Assembly ...
Page 92: ...92 6500 509 001 REV B www stryker com Return To Table of Contents Cot Assembly ...
Page 93: ...www stryker com 6500 509 001 REV B 93 Return To Table of Contents Cot Assembly ...
Page 97: ...www stryker com 6500 509 001 REV B 97 Return To Table of Contents Base Assembly ...
Page 98: ...98 6500 509 001 REV B www stryker com Return To Table of Contents Base Assembly ...
Page 106: ...106 6500 509 001 REV B www stryker com Return To Table of Contents Notes ...
Page 118: ...118 6500 509 001 REV B www stryker com Return To Table of Contents Foot End Assembly ...
Page 124: ...124 6500 509 001 REV B www stryker com Return To Table of Contents Optional Gatch Assembly ...
Page 171: ......