IIn
nsstta
alllla
attiio
on
n
IIn
nsstta
alllliin
ng
g S
Se
eccu
urre
e C
Co
on
nn
ne
ecctt
T
To
oo
ollss rre
eq
qu
uiirre
ed
d::
•
#2 Phillips screwdriver
•
#1 Phillips screwdriver
•
Straight pick
•
Tape measure
•
Level
•
Pencil
•
Tools required for hospital supplied fasteners
P
Prro
occe
ed
du
urre
e::
1. Record the S
Se
eccu
urre
e C
Co
on
nn
ne
ecctt BBID (
(page 5)) and room number/patient position on the
2. Using a straight pick, configure the SB1 and SB2 dip-switches (A) to match the nurse call system and nurse call
communication cable (Figure 2).
C
CA
AU
UT
TIIO
ON
N -- Always match the dip-switches on SB1 and SB2 to the connected product configuration to avoid the risk of
head wall damage.
N
No
otte
e -- To confirm dip-switch configuration, contact Stryker customer service or technical support (
A
B
C
F
Fiig
gu
urre
e 2
2 –– S
Sw
wiittcch
h cco
on
nffiig
gu
urra
attiio
on
n
3. Using a straight pick, turn the S
Se
eccu
urre
e C
Co
on
nn
ne
ecctt O
ON
N//O
OF
FF
F switch (B) to the O
ON
N position (Figure 2).
4. Install the two supplied IPX labels (C) over the dip-switch and the O
ON
N//O
OF
FF
F cutouts located on the back of the S
Se
eccu
urre
e
C
Co
on
nn
ne
ecctt (Figure 2).
5. Using a tape measure and pencil, mark the intended center of the bed location (vertical line) (Figure 3).
EN
6
5212-009-205 Rev AB.1