6
4. Secure the handle in place inside the handle socket. Without any weight on the jack, cycle the lift up and down
several times to insure the hydraulic system is operating properly. (Perform to the Air Purge Procedure before first
use.)
SYSTEM AIR PURGE PROCEDURE
IMPORTANT: BEFORE FIRST USE
Perform the following Air Purge Procedure to remove any air that may have been introduced into the hydraulic system
as a result of product shipment and handling. This step is to be completed without any weight on the jack.
1.
Turn release valve counterclockwise on full turn to the open position.
2.
Rapidly pump the handle 6-8 times. Leave handle in down position to expose oil fill plug.
Summary of Contents for 46217
Page 15: ...15 ASSEMBLY DIAGRAM ...