ASSEMBLY INSTRUCTIONS FOR:
Page 2
11/07/00
CONTENTS:
Assembly instructions & tools
Boiler base details & Important assembly advice
Wall clearance dimensions
Pulling up sections
Pulling up sections
Positioning & Influence of baffles
Diagram of RU1 injector tube
Fitting the flue-gas collector hood
Fitting the rear wall protective refractory
Converting the burner door hinge
Assembly of boiler connections
Assembling the jackets and insulation
BRU 1s Bicalor assembly completion
BRU 1s Bicalor jacket & insulation assembly
Assembling the burner
Gas connections
Opening & closing burner door
Wiring details for control panel
RU 2s Assembly section
Fig. 1.2 through to Fig. 8.2 with corresponding notes
RU 2s Jacket assembly
RU 3s Assembly section
Fig. 1.3 through to Fig. 8.3 with corresponding notes
RU 3s Jacket assembly
Page :
3
4
5
6
7
8
9
10
10
10
11
12
13
14
15
16
17
18
22 & 23
27 & 28