ASSEMBLY INSTRUCTIONS FOR:
Page 12
11/07/00
To assemble the jackets and insulation
Follow the number sequence.
Floor insulation and side jackets
1. Floor insulation on right and left-hand side
125x440xL
2. Right and left hand side jackets
3. Insulation at the bottom front
50x90x990
4. Angle at the bottom front.
21x21-1156
5. Angle at the bottom rear (galv)
21x21-1156
Rear jacket insulation and rear jacket
1. Cross bar at the top rear
90x40x985
2. Flue gas housing insulation
50x180x2000
3. Rear jackets right and left hand
4.
Protective
metal
sheet
5. Flue hood access door insulation
125x330x700
6. Flue hood access door jacket cover
Boiler top insulation and front jackets
1. Cross-bar at the top front
135x40x985
2. Insulation at the top rear
125x90x990
3. Insulation at the top front
125x135x990
4. Boiler top insulation
125x1100xL
5. Instrument panel on top jacket
(See instrument panel assembly instructions)
6. Boiler covering top jacket
7. Boiler front jackets right and left
8. Boiler front wall, ARF to the right
9. Sealing plate
ASSEMBLY
INSTRUCTIONS
FOR:
RU 1s Assembly