![Stratus ftServer 2510 Site Planning Manual Download Page 71](http://html1.mh-extra.com/html/stratus/ftserver-2510/ftserver-2510_site-planning-manual_1383762071.webp)
Cabinet Requirements
Cabinet and Monitor Requirements
6-3
shows the required rail clearance between the front vertical rails and the
inside edge of an accessory leg.
Figure 6-1. Rail Clearance
1
Front vertical EIA rail
2
Accessory leg
3
Front of cabinet
0.5-inch
(1.27-cm)
minimum
0.5-inch minimum
msys182
1
2
3
Summary of Contents for ftServer 2510
Page 1: ...Stratus Technologies R627 04A Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide...
Page 8: ...Tables viii Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Page 12: ...Preface xii Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Page 50: ...Planning for Cables 3 4 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Page 104: ...Index Index 4 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...