![Stratus ftServer 2510 Site Planning Manual Download Page 14](http://html1.mh-extra.com/html/stratus/ftserver-2510/ftserver-2510_site-planning-manual_1383762014.webp)
Site Planning Overview
1-2
Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide
(R627)
Provide electrical power sources that meet the requirements of the system and
optional components, optionally including the purchase of a qualified
uninterruptible power supply (UPS)
.
Provide adequate space for the system or cabinet and for a desk or table to
accommodate components outside a cabinet. Also provide enough space for
servicing the systems and components.
Provide an environment that meets the system's requirements for ambient
temperature and air quality.
Provide sufficient network and analog telephone lines and plan the location of the
system and external components to accommodate the lengths of the connecting
cables.
For ftServer systems running VMware ESX, provide a computer to act as a
management PC. Also provide a serial cable to connect the management PC to the
ftServer system, or provide some other way to connect to the ftServer system
through a serial connection. After you install the operating system and ftSSS, at
times, you may be unable to use the monitor, mouse, and keyboard directly
attached to the system.
Ensure that the power distribution units (PDUs) supply sufficient power to the
components you have purchased and that you have sufficient space available in
an appropriate cabinet.
Use the
“Site Planning Checklist” on page 1-4
to track your site preparation progress.
For information about obtaining documents related to your ftServer system, see
“System Documentation” on page 1-7
During the site planning and preparation processes, work closely with your facilities
group or contractor to determine space, power, and environmental requirements. Enlist
their help to provide a suitable location with sufficient alternating current (AC) power,
heating, ventilation and air conditioning (HVAC) capabilities, and network and
telephone connections.
If your system is covered by a service agreement and you need help with site planning,
contact the Stratus Customer Assistance Center (CAC) or your authorized Stratus
service representative. If you have a contract with the CAC or your authorized Stratus
service representative to install the system, contact them after you have prepared the
Summary of Contents for ftServer 2510
Page 1: ...Stratus Technologies R627 04A Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide...
Page 8: ...Tables viii Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Page 12: ...Preface xii Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Page 50: ...Planning for Cables 3 4 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Page 104: ...Index Index 4 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...