
AC Power and HVAC Service Requirements
3-2
Stratus ftServer 2500, 4400, and 6200 Systems: Site Planning Guide
(R609)
AC Power and HVAC Service Requirements
From the
Stratus ftServer Systems: Peripherals Site Planning Guide
(R582), obtain the
nominal input line voltage (volts AC) and frequency (Hz) required for optional,
AC-powered components. In general, provide 100–240 VAC at 50 or 60 Hz for optional
components. PDUs require 200–240 VAC at 50 or 60 Hz.
For detailed information about the plug types and lengths of the power cords provided
with the system, see
“Power Cord Summary” on page 3-15
The power service must be properly wired and grounded according to local standards
and regulations. See
Appendix B, “Electrical Circuit and Wiring Information”
for more
information.
N O T E
Circuit breakers must provide a protective earth ground
current at a maximum of 3.5 milliamperes (mA) for each
AC power cord.
Use the following worksheets to determine AC power requirements for the site.
In
, determine the power requirements at the A-side power source.
In
, determine the power requirements at the B-side power source.
In
, determine the power requirements for components outside of the
cabinet. These components can share a power source with the A-side or B-side
components.
In
, determine the related HVAC requirements.
To determine AC power requirements
Provide information in Tables
as follows:
1. In the Quantity column, write the number of each type of component.
2. Multiply the entry in the Quantity column by the number in the Watts column, and
enter the result in the Watts Subtotal column.
3. Add the values in the Watts Subtotal column, and enter the sum on the bottom line.
This value indicates the maximum power requirement for each power source.
Summary of Contents for ftServer 2500
Page 1: ...Stratus Technologies R609 04A Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide ...
Page 5: ...Contents Contents v Index Index 1 ...
Page 12: ...Preface xii Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Page 29: ...Safety Notices Site Planning for ftServer 2500 4400 and 6200 Systems 1 17 W A R N I N G ...
Page 30: ...Safety Notices 1 18 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Page 56: ...Planning for Cables 4 4 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Page 106: ...Index Index 4 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...