PANEL ASSEMBLY
PRE-DRILL RECEIVING RAIL
Measure and mark the holes for mounting the Receiving
Rail to the posts. The top and bottom holes are to be a
maximum of 4/5” (20mm) from the end of the rail. The
remaining holes are to be spaced evenly at a maximum of
18” (450mm) centres (Figure 2.0).
Pre-drill the Receiving Rail mounting holes using a 3mm or
1/8” drill bit.
INSTALL BOTTOM RECEIVING RAIL CAP
Push receiving rail cap into the receiving rail and fasten using
two 8g x 11/5” (30mm) countersunk screws (Figure 2.1). The
cap may need to be knocked in using a rubber mallet. Use a
low torque setting on the drill to avoid snapping the screws.
Post
Base Plate
4x 12g x 3” Pan Head Screws
FIGURE 1.4
Four M10
Masonry
Anchors
Four
ø
25
⁄
64
”
(
ø
10mm)
Holes
3”
(75mm)
3” (75mm)
(Min.)
3”
(75mm)
3” (75mm)
(Min.)
FIGURE 1.5
Screw Locator Groove
*Maximum 18” (450mm) centres
4
⁄
5
”
(20mm)
*Hole centre distance varies depending
on height of fence panel. Maximum
distance between holes to be 18”
(450mm). Installer to determine
spacing and number of screws
required.
4
⁄
5
”
(20mm)
FIGURE 2.0
Receiving Rail Cap
Receiving Rail
2x 8g x 1
1
⁄
5
” (30mm)
Countersunk Screws
FIGURE 2.1