
Unloading
The unloading area should be a level surface.
A clearance of at least 50 cm (19.7 in.) from the top of the printer is required for lifting the printer onto a
forklift. The lifting height of the printer is at least 20 cm (7.8 inches).
The installation location must be accessible from the unloading area. A professional mover is
responsible for unloading the printer from the truck and transferring it to the installation location.
The forklift extensions and the printer's center of gravity are shown in the figures below.
Warning: Lifting Hazard
Do not lift the printer from the sides. Do not lift the printer from the front. The
printer's center of gravity is near the back of the printer.
The forklift extensions and the printer's center of gravity are shown in the figures below.
Figure 2 Forklift position
Objet1000 Plus
Shipment and Delivery
8