Introduction
The information and requirements provided in this document ensure proper installation and operation of
the Objet1000 Plus 3D printing system. The customer is responsible for preparing the site as
described in this document, and according to any applicable local regulations.
If you have any questions about the information in this document, contact your Stratasys
representative.
All site requirements must be met before the installation date. The Site Preparation Checklist should
be submitted to your Stratasys representative. Shipping will be arranged after the checklist is received
by Stratasys.
Non-compliance with requirements specified in this document may result in additional installation
charges.