Page 2: ...form or by any means nor stored in a database or retrieval system without prior permission in writing from Stratasys Ltd If this document is distributed as a PDF file you may print it for internal use...
Page 3: ...13 Grounding 13 Circuit Breaker 14 Residual Current Device RCD 14 Power Connection 14 UPS Uninterrupted Power Supply 15 Communication Lines 16 Local Area Network 16 Telephone 16 Environmental Conditi...
Page 4: ...Cleaning Solvent 21 Site Preparation Checklist 22 DOC 06500 Rev J 4...
Page 5: ...l regulations If you have any questions about the information in this document contact your Stratasys representative All site requirements must be met before the installation date The Site Preparation...
Page 6: ...into the printer Figure 1 Objet1000 Plus printer Size and Weight The following table shows the size and weight information for the printer W H D mm W H D inch Weight kg lb 2686 1960 2102 105 7 77 2 8...
Page 7: ...ks and moves it to its final location Upon request your Stratasys service provider will advise regarding these matters Note A Stratasys certified customer support engineer must be present while the pr...
Page 8: ...ver is responsible for unloading the printer from the truck and transferring it to the installation location The forklift extensions and the printer s center of gravity are shown in the figures below...
Page 9: ...Figure 3 Printer center of gravity Objet1000 Plus Shipment and Delivery 9...
Page 10: ...d cabinets are recommended near the printer for convenient storage of tools parts accessories manuals and materials Floor Plan Printer Area The following is a sample floor plan showing the 3D printing...
Page 11: ...Figure 5 shows the position of the leveling legs under the printer Figure 5 Position of leveling legs Objet1000 Plus Installation Area 11...
Page 12: ...ent Workstations Specifications for client workstations running GrabCAD Print instead of Objet Studio are listed here http help grabcad com print system requirements Objet1000 Plus Client Workstations...
Page 13: ...0 Hz 1 phase Full load current 8 A Short circuit rating 15 A Printer short circuit rating 10 000 A If the power at the facility does not support the above specifications contact your Stratasys special...
Page 14: ...rent Device RCD The wall outlet must be connected to a residual current device RCD Power Connection The following diagram shows how to connect the printer to the local power supply Figure 7 Electrical...
Page 15: ...ic voltage regulation 2 Output Connections IEC 320 C19 Batteries Runtime Bridging time Minimum 60 minutes at 1500 W Interface port s RJ 45 Serial Smart Slot Network Management Cards Remote monitoring...
Page 16: ...twork A LAN communication cable is required for connecting to the printer via remote workstations Telephone A telephone near the printer is recommended for general communication and service calls Obje...
Page 17: ...ssipation Printer 6278 BTU hr The room temperature and relative humidity should not exceed the limits listed in the table below Range Temperature 18 C to 25 C 64 5 F to 77 F Relative humidity 30 70 no...
Page 18: ...exhaust adapter is supplied with the printer When attached to the back of the printer and connected to an external ventilation fan with a duct air expelled from the printer is discharged directly out...
Page 19: ...aning unit Figure 9 Build tray cart The table below lists the specifications of the build tray cart Table 7 Cart specifications Load capacity 300 Kg 662 lbs Lower limit 545 mm 21 5 in Upper limit 1110...
Page 20: ...clude an air dryer unit a water oil trap must be installed on the air gun used for cleaning the printer The recommended air pressure is 5 7 bar 70 90 PSI Fire Safety Equipment A gas based fire extingu...
Page 21: ...for handling and storing specific materials appear in the Material Safety Datasheet MSDS included with each material No more than five crated containers can be stacked on top of each other Note Non c...
Page 22: ...listing all of the tasks described in this document Fill in the information requested in the checklist and submit it to your Stratasys representative An installation date will be scheduled after the c...
Page 23: ...et260 Connex3 Objet350 Connex1 Objet350 Connex2 Objet350 Connex3 Objet500 Connex1 Objet500 Connex2 Objet500 Connex3 Durus Endur Vero VeroBlue VeroBlackPlus VeroClear VeroCyan VeroDent VeroDentPlus Ver...